WEC_headerReplacement
Blog

NG-RCCA: Reliability and Control When You Need It

January 12, 2018 by Westinghouse Electric Company

Categories: General Topics

Nuclear plants are designed to quickly get to power and stay at power. In fact, that’s one of the benefits of nuclear energy – reliable, cost-effective baseload electricity, even in challenging weather conditions.

Westinghouse Quiver

November 21, 2017 by Westinghouse Electric Company

Categories: General Topics

Safe, Simple & Cost-effective Transfer of Leaking Fuel Rods & Fragments

Nuclear Parts Operations: Where the Past Meets the Present

November 17, 2017 by Westinghouse Electric Company

Categories: General Topics

Out with the old and in with the new. It’s a familiar adage, but one that has profound connection to today’s “throw-away” society. From electronics to automobiles to appliances, we are focused on obtaining new rather than fixing old. However, in a highly regulated industry, that doesn’t always apply.

Westinghouse Sigma™ RCP/SHIELD® Seals

November 3, 2017 by Westinghouse Electric Company

Categories: General Topics

The Westinghouse Sigma™ Reactor Coolant Pump Seal provides reliable performance and cost savings to ensure safe and long-term plant operation. This seal has been rigorously developed and tested to provide up to a 12-year life in order to reduce your seal maintenance cost, decrease refueling outage dose, eliminate seal installation issues, and more.

Harness the Power of TRITON11® Fuel

October 18, 2017 by Westinghouse Electric Company

Categories: General Topics

The latest innovation in BWR fuel from Westinghouse

With its best-in-class uranium utilization and thermal margins, TRITON11® fuel, the most recent BWR fuel innovation from Westinghouse, offers utilities the power to improve fuel cycle cost savings and optimize operations. Each key aspect of the TRITON11 design has been carefully considered, analyzed and tested to meet customers’ current and anticipated operational requirements.